- First step
- Heritage survey and conservation-experienced architect
- Approval
- URA written permission for conserved works
- Costs
- Vary with condition and scope; get quotes
- Focus areas
- Façade, roof, structure, services
Process overview
| Step | What happens |
|---|---|
| 1. Due diligence | Review prior approvals, structural condition and conservation grade. |
| 2. Design | Appoint a qualified person with conservation experience. |
| 3. Approvals | Obtain URA written permission and other agency approvals. |
| 4. Works | Façade, roof, structural and M&E works by experienced contractors. |
| 5. Completion | Inspections and submission of as-built records. |
Repair before replace: the original fabric is the asset.

Main cost drivers
No cost figures are given here because they vary by project; obtain written quotes.
| Driver | Why it matters |
|---|---|
| Structural condition | Older timber and masonry may need repair. |
| Façade restoration | Plaster, tiles and timber require specialist trades. |
| Roof | Clay tiles and timber structure. |
| Change of use | Added fit-out for F&B or hospitality. |
| Professional fees | Architect, engineers, specialist consultants. |

Related guides
See the URA conservation buyer manual and the F&B licensing guide for approvals tied to use.

