The short answer
Fit-out in a Singapore shophouse usually needs landlord consent, URA approval for façade, roof or structural changes and for advertisement signs, and SCDF approval for fire safety. Conservation rules restrict what you can change externally, so plan the approvals timeline before the lease start date.
- Signage
- URA and landlord approval
- Façade / roof
- URA conservation guidelines
- Fire safety
- SCDF, usually through a QP
- Food premises
- PUB grease interceptor requirements
Last reviewed 2026-11-05. Rules and fees change; confirm with the relevant agency before committing to a lease or fit-out.
Who approves what
| Work | Approval | Typical constraint |
|---|---|---|
| Shop signage and advertisements | URA and landlord | Size, placement and illumination controls; protected façade |
| Façade, roof or structural changes | URA, QP, landlord | Conservation guidelines apply |
| Interior partitions and layout | QP; authorities as required | Party walls and structure |
| Fire detection, exits, sprinklers | SCDF | Occupant load and use drive requirements |
| Air-conditioning plant | Landlord, URA if visible externally | Roofscape and façade protection |
| Drainage and grease traps | PUB | Required for food premises |

Signage tips
- Check the lease for the landlord's signage rights before designing.
- Expect stricter controls on projecting and illuminated signs in conservation areas.
- Do not obstruct the five-foot way, which is a public passage.
- Allow approval time before fabrication; unapproved signs may need removal.
Budget for base-building compliance before the quotations arrive.
Fire safety essentials
SCDF sets requirements for exits, detection, extinguishing and cooking installations through the Fire Code and its approval process, usually led by your QP. Higher occupant loads, sleeping accommodation and commercial kitchens increase requirements.

Suggested approvals timeline
- Before signing: check approved use, fire safety status, and signage and plant feasibility.
- At signing: allocate approvals and rent-free period in the lease.
- Design stage: QP prepares URA, SCDF and other submissions.
- Pre-opening: obtain operator licences and inspections.
Sources and where to verify
- Urban Redevelopment Authority (URA)
- Singapore Civil Defence Force (SCDF)
- PUB, Singapore's National Water Agency
See also our shophouses for rent hub and the commercial shophouse permitted uses overview.
